Skip to main content
R.W. Sullivan
  • News
  • Careers

Search form

Menu

  • What we do
  • Who we are
  • Our Projects
  • Contact Us
  • What we do
  • Who we are
  • Our Projects
  • Contact Us
  • News
  • Careers

You are here

  • Home
  • St. Mark's School STEM, Southborough, Massachusetts

St. Mark's School STEM, Southborough, Massachusetts


  • Educational K-12

Overview:

  • The demolition of one building and construction of another allowed for the housing of the school's new STEM (Science, Technology, Engineering & Math) program.
  • Multiple projects and renovations also served to provide for new and improved spaces.

STEM Program: The project scope of work included demolition of the greenhouse and the existing three level portion of the building adjacent to the Math wing.  In place of the demolished portion of the building, a 14,600 sq/ft addition/infill was constructed which included 3 stories with a full basement. The program for the addition consisted primarily of classrooms for the STEM (Science, Technology, Engineering & Math program). Estimated construction cost is $14 million. Project was completed in 2015.

Multiple Projects: The project scope of work included renovations to multiple areas including the Admin Building, Red Hall, Taft Hall, Forbes Student Center and the Math Wing. The 1st and 2nd floors of the administration wing were renovated. Red hall was substantially renovated including new air conditioning and life safety upgrades. Taft Hall was renovated to provide new classroom spaces, a darkroom and a sculpture studio. The Math Wing was renovated to provide a new location for staff offices as well as the student book store. Forbes Student Center and was a “gut” renovation and required new construction. A new elevator was provided. Estimated construction cost of $5 million.

Burnett House: The scope of work included a complete “gut” renovation of the existing space in order to accommodate the new fitout of the student day lounge. Masterplan: (code and life safety): A masterplan study of the existing campus for future renovations was the scope of this project. We evaluated the existing buildings in preparation of renovations/additions and suggesting locations for firewalls, to provide most practical areas for new construction.

Featured Projects

  • Residential

1st Assemblage, Cambridge, Massachusetts

View this project
  • Hotel

Hyatt Regency, Cambridge, Massachusetts

View this project
R.W. Sullivan
  • Who We Are
  • What We Do
  • Our Projects
  • Contact Us
  • Careers

The Schrafft's City Center

529 Main St. Suite 203

Boston, MA 02129-1107

617-523-8227

Copyright 2023 R.W. Sullivan | Site created by Boston Digital